A, B and C can complete a work in 10 days. They start together and 60% of the work is done by B and C. A worked only for 2 days with B and C and then left. B takes 20% less time than C. If Rs. 3000 is paid for whole work then find the share of B.
- ARs. 1000
- BRs. 800
- CRs. 1200
- DRs. 1500
Answer not set