A minimum seating pressure or preload of 70 g/cm2 (0.7 t/m2), shall be applied and removed before starting the load test.
Then the load is applied with regular increment, using hydraulic jacks. Usually the increment is about 1/5th of the estimated safe bearing capacity of the soil.