A contractor undertakes to complete the construction of a tunnel 720 meters long in 240 days and employs 60 men for the purpose. After 120…

352207Medium 1 reply 599 views
0
A contractor undertakes to complete the construction of a tunnel 720 meters long in 240 days and employs 60 men for the purpose. After 120 days, he finds that only 240 meters of the tunnel is complete
  • A70 men
  • B60 men
  • C55 men
  • D80 men
Correct answer: B

Discussion 1

0
CCommunity
60 men

In 120days, only 240m of the tunnel is constructed by 60 men.
The remaining 120days, 480m of the tunnel can be constructed by 120 men.
Additional number of men required = 120 - 60 = 60 men.