Pick up the incorrect statement from the following:

354899Medium 1 reply 658 views
0
Pick up the incorrect statement from the following:
  • AThe width of the wall is constructed thicker at the base in a stepped fashion
  • BA long vertical load transferring concrete structure is called a concrete pile
  • CIn pile which transfers the load to the soil by the friction between the pile and the surrounding soil is called friction pile
  • DThe pile which transfers the load to a hard rock bed at certain depth is called load bearing
Correct answer: D

Discussion 1

0
CCommunity
The pile which transfers the load to a hard rock bed at certain depth is called load bearing