Question discussion

The SRS document produced at the end of requirement analysis and specification is known as ______.

358663Medium DSSSB TGT Computer Science 0 replies 0 views
0
The SRS document produced at the end of requirement analysis and specification is known as ______.
  • Ablack-box specification
  • Barchitectural design
  • Cdesign plan
  • Dwhite-box specification
Correct answer: A

Explanation

The SRS document describes what the system should do without describing how it works inside, so it is a black-box specification.

Discussion 0

Nobody has replied yet. Start the discussion!