Which of the following is a conflict serializable schedule?
S1: R1(A); R1(B); R2(A); R2(B); W2(B); W1(A)
S2: R1(A); R2(A); R2(B); W2(B); R1(B); W1(A)
- AS1 is conflict serializable but S2 is not.
- BS1 is not conflict serializable but S2 is conflict serializable.
- CBoth are not conflict serializable.
- DBoth are conflict serializable.
Correct answer: B